Scheduling Construction Projects
By:Edward M. Willis
Published on 1986 by John Wiley & Sons
Described in this book are several project scheduling methods for construction. It enables its readers to prepare schedules based on those methods and demonstrates the uses that can be made of project schedules and of other data derived from those schedules. The methods covered include the Critical Path Method (CPM), the Precedence Method (PM), the Program Evaluation and Review Technique (PERT) and a probabilistic method. Several scheduling-related techniques are also discussed, including activity crashing and project expediting, cash flow projections and resource leveling and resource-constrained scheduling.
This Book was ranked at 13 by Google Books for keyword practice and procedure for the quantity surveyor.
Book ID of Scheduling Construction Projects's Books is pDOzAAAAIAAJ, Book which was written byEdward M. Willishave ETAG "UKTqzGyV4sc"
Book which was published by John Wiley & Sons since 1986 have ISBNs, ISBN 13 Code is and ISBN 10 Code is
Reading Mode in Text Status is false and Reading Mode in Image Status is false
Book which have "462 Pages" is Printed at BOOK under CategoryConstruction industry
This Book was rated by Raters and have average rate at ""
This eBook Maturity (Adult Book) status is NOT_MATURE
Book was written in en
eBook Version Availability Status at PDF is falseand in ePub is false
Tidak ada komentar:
Posting Komentar